Four Mile Recycling Project- building 3 big ponds for water, with clay liner and roads built.  Approx. 120,000 yds of dirt moved.

Town of  Hayden Water & Sewer line replacement- Replace 1290  ft of water main line and 600 ft of 8” sewer main line through of the Town of Hayden. 

Routt County Funk Gravel Pit – 2006 topsoil stripping project. Removed 70 yds of topsoil on a County Gravel Pit.

Redwine Resources oilfield work- 2006 building roads, hauling gravel, building pads, reclamation and seeding, fence building and other misc. work. 

Colowyo Fuel Pad Project- 2006 building a Pad for a Fuel tank to sit on.  Dirt work, Concrete Prep, Place Concrete

Petroleum Development Corporation-   2006 Reclaim property, seeding, Road maintenance. 

DOW-  2006 River Bank Stabilization Project on Yampa River, 2006 SWA Pond cleaning south of Meeker CO and 2006 Parking lot maintenance at Craig Station. 

Colowyo Pond Cleaning – 2006, 2007, 2008 pond cleaning, moved approx.  4400 yards of mud on mine site.  

PSS – Craig & Hayden Power Plant- Work done as a sub-contractor at the Power Plant Craig Station

20 Mile Tank Pad Project- 2006 Foundation excavation, Gravel hauling, and placement, Concrete Prep, and Installation, Heating to keep ground unfrozen

Town of Hayden Waterline replacement 2007-  Replace 4500ft of waterline thru the Town of Hayden CO

Black tail Subdivision Stagecoach CO 07- Overlot grading, underground utilities (water, sewer, electric) road work and paving. 

Deserado Mine Refuse pile-  Moving 63,000yds of Refuse on the mine site.

 Steamboat Transit Regional Facility-  Do the foundation work for the Bus Garage, backfill and underground utilities. 

Hampton Inn & Suits -  Hauling in 30,000 yds of fill dirt and pit run, doing foundation work, underground utilities, and parking lot.

Standard Plumbing Building - 1999 Site prep, foundation, underground utilites and Parking area.

Wendy's of Craig - 1999 Site prep, foundation, underground utilities and parking area.